
Northgate Industrial Hall
Clear-span industrial hall with crane beams, erected in five months from factory-made steel.
A clear-span industrial hall for light manufacturing, with heavy-duty flooring, gantry crane beams and full metal engineering by our in-house team.
Factory-manufactured steel kept site time to five months, and the facility passed commissioning on the first inspection.